A Success Story

HISTORY

“LIM-EM” sh.pk was founded in 1999, based on the production and sale of the raw materials with high quality of construction and infrastructure materials, through its own Inert Production Plant. In 2000, its activity expanded with the construction of civil works, industrial constructions, roads and water utilities all over Albania. LIM-EM with over 20 years of consolidated experience and reputation has made significant steps in designing and building objects of various sizes and functions. Our activities are focusesd on urban, commercial, industrial construction and engineering and architectural design services.

26 march, 2018

“Mozart” Project

Elegant French-style Mozart is located on Zogu-I Boulevard, in front of the Ministry of Justice at “Dervish Hatixhe” street. It is a multifunctional residential and service building.
26 march, 2018

07 february, 2017

“Pool Tower” Project

Pool Tower Complex consists of 9-storeys business tower and 2 underground parking floors and residential tower, located 1 km away from the center of Tirana, in Durres street.
07 february, 2017

03 July, 2015

Service Design and Warehouse

It includes design and implementation of a two floors warehouse and a car service in Kashar area, according to customer requirements and with the highest quality.
03 July, 2015

29 April, 2015

“Euro Elektra” Industrial Project

It includes design and implementation of Euro Elektra Industrial shed, a multifunctional object, built from the highest quality materials and the most innovative technologies.
29 April, 2015

02 March, 2015

“Luxor 2” Project

Luxor 2, located in Lapraka, with an area of 10,480 m2, 6-storeys and 2 parking floors only 2 km away from the center of Tirana.
02 March, 2015

09 January, 2015

“Solei” Project

Solei, 4-floors residential building and 1 underground parking floor. It offers high standards of construction, tranquility, fresh air, proximity to schools, complete road infrastructure.
09 January, 2015

06 January, 2015

Industrial Project, Cosmonte Foods

Implementation of the project of Cosmonte Foods Company, to build 2,778 m2 of refrigerated warehouses, and 2,114 m2 of administrative offices and sales units.
06 January, 2015

09 September, 2014

The building in Elbasan Street

This building consists in 8 residential storeys, 2 underground parking floors and the ground floor consists in commercial units with maximum exposé to the main street, in front of the US Embassy in Elbasan Street.
09 September, 2014

14 June, 2014

“Luxor 1” Project

This building consists of 8 residential storeys , 2 underground parking floors and the ground floor consists in commercial units, positioned 150 m away from Avni Rustemi Square (Pazari i Ri) and 150 m away from the center of Tirana.
14 June, 2014

05 July, 2013

Durres-Kavaja Water Utility

It includes the Tender Process of “Water supply of Durres-Kavaja beaches” for the supply of potable water to residential areas near the coastline.
05 July, 2013

28 January, 2013

16 floors Building

16 floors multifunctional building, consisting of offices and residential apartments, positioned in the capital’s favorite area, in Donika Kastrioti Street.
28 January, 2013

20 January, 2013

Agri-Food Market

Construction of Tirana Agri-Food Market, which represents the most modern trading structure of the latest technology, in accordance with the requirements of food trading.
20 January, 2013

29 August

“Liburnia” Project

Building composed of 6 residential storeys and 1 underground parking floor offers apartments and business units, on Taulantia Road, with a wonderful view near the beach
29 August

2011

Building Repair and Reinforcement

Reinforcement and restructuring of structures, due to changes of mechanical attributes and bearing capacity, in the 20-year-old building on Tano Banushi Street.
2011

2011

Primary School and Kindergarten

Design and construction of the primary school in Kashar, with 3 storeys and one underground floor, to create and improve teaching conditions.
2011

2009

“Belleview” Project

The Belleview complex, built near Artificial Lake has a total area of 12,909 m² and consists of 3 separate buildings. Each building has 4 storeys and 2 parking floors.
2009

24 September, 2008

“Area” Project

13 storeys and 1 underground parking floor building, located in the center of Durres, near the former police station, with a total construction area of 21,293 m².
24 September, 2008

17 May, 2005

“Blue Tower” Project

Pro-Credit Bank Tower, residential and service complex located in one of the main areas of the capital, on Dritan Hoxha Street, where the headquarters of many large businesses in Albania are located.
17 May, 2005

25 June, 2003

“Lind-or” Project

Building with 8-storeys and 2 underground floors, in a strategic position, on “Pjeter Budi” street, 100 m behind the US Embassy, near Elbasan street.
25 June, 2003

Fitness and heating system

Gym design and construction, installation of heating system (boilers) and yard system for elementary and secondary schools, Kashar Municipality.
5000
Projects
5000
Apartments
100
Employee
7
Price
Ju duhet ndihmë? Kontakto